Misha Design Widebody Kit Build Thread SEMA 2010 Completion
#111
Day 8 – our time is getting crunched as we get closer to the latter half of the install. The panels in the back require a tremendous amount of molding for Them to be ready to wrap in vinyl.
Here we have added a chipboard filler to close the opening between the speaker panel and the sub box. We will be filling the gaps with marglass
As you can see I have also added a detail window on the console side to give the console som flavor. The upholstery in the back will be two tone like the trunk panels using grey and black mb texture vinyl.
Now we are ready to mold our panels to the car interior and create the illusion that these are all factory panels
Once the panel dries it will be removed from the car and it’s back to sanding.
Now that we are close to done with one side we are going to start the same process all over again on the other enclosure. These boxes by no means are easy. The pictures are Deceiving as just one side has take over 10 hours to finish from the beginning of the molding process to the ready to upholstery stage.
Here we have added a chipboard filler to close the opening between the speaker panel and the sub box. We will be filling the gaps with marglass
As you can see I have also added a detail window on the console side to give the console som flavor. The upholstery in the back will be two tone like the trunk panels using grey and black mb texture vinyl.
Now we are ready to mold our panels to the car interior and create the illusion that these are all factory panels
Once the panel dries it will be removed from the car and it’s back to sanding.
Now that we are close to done with one side we are going to start the same process all over again on the other enclosure. These boxes by no means are easy. The pictures are Deceiving as just one side has take over 10 hours to finish from the beginning of the molding process to the ready to upholstery stage.
#112
Again we are Making insertable grills for our rear spears as well as some extras which will get sent out for a real carbon fiber overlay
Here we are 12 hours later at the end of day 8. The Box on the passenger side has only begun to be molded.
Here we are 12 hours later at the end of day 8. The Box on the passenger side has only begun to be molded.
#114
iForged Project SL Audio Build
Stereo Project Countdown.
Full CES build in 11 Days
Installer: Frank Sbrocca and his team at Traffic Jams in North Hollywood, CA.
Diamond Audio Technologies - Home
Fierce Car Audio - Home
Kenwood
RCH Designs | Photography | Graphic Design | Web Development | Video/Motion | Concept Development | Huntington Beach, California - Home
Kenwood Gear arrived today
Kenwood Excelon DNX9960 Head Unit
Kenwood KCA-iP301V iPod Adapter
Kenwood CMOS-300 CMOS-300 Multi View Camera
Day ten is here and it’s the final crunch time. First order of the day Is to start the wiring process and finish wrapping our other sub/speaker box.
Day ten is here and it’s the final crunch time. First order of the day Is to start the wiring process and finish wrapping our other sub/speaker box.
With box 2 almost done with the vinyl wrap it’s time to prep the car for installation off our rear boxes.
My base on the passenger side was cutout to allow access to the factory fuses below.
Once that was done the speakers were wired up and installed and our sub box was screwed down to our base plate and the console to ensure the stay in place.
Lot’s of wiring going on right now on day 10. Were getting close to done and are almost ready to start wiring our amp rack in the trunk.
Lot’s of wiring going on right now on day 10. Were getting close to done and are almost ready to start wiring our amp rack in the trunk.
Lot’s of wiring going on right now on day 10. Were getting close to done and are almost ready to start wiring our amp rack in the trunk.
Lot’s of wiring going on right now on day 10. Were getting close to done and are almost ready to start wiring our amp rack in the trunk.
Anderson connector being wired so the car can get power at CES
Stereo Project Countdown.
Full CES build in 11 Days
Installer: Frank Sbrocca and his team at Traffic Jams in North Hollywood, CA.
Diamond Audio Technologies - Home
Fierce Car Audio - Home
Kenwood
RCH Designs | Photography | Graphic Design | Web Development | Video/Motion | Concept Development | Huntington Beach, California - Home
Kenwood Gear arrived today
Kenwood Excelon DNX9960 Head Unit
Kenwood KCA-iP301V iPod Adapter
Kenwood CMOS-300 CMOS-300 Multi View Camera
Day ten is here and it’s the final crunch time. First order of the day Is to start the wiring process and finish wrapping our other sub/speaker box.
Day ten is here and it’s the final crunch time. First order of the day Is to start the wiring process and finish wrapping our other sub/speaker box.
With box 2 almost done with the vinyl wrap it’s time to prep the car for installation off our rear boxes.
My base on the passenger side was cutout to allow access to the factory fuses below.
Once that was done the speakers were wired up and installed and our sub box was screwed down to our base plate and the console to ensure the stay in place.
Lot’s of wiring going on right now on day 10. Were getting close to done and are almost ready to start wiring our amp rack in the trunk.
Lot’s of wiring going on right now on day 10. Were getting close to done and are almost ready to start wiring our amp rack in the trunk.
Lot’s of wiring going on right now on day 10. Were getting close to done and are almost ready to start wiring our amp rack in the trunk.
Lot’s of wiring going on right now on day 10. Were getting close to done and are almost ready to start wiring our amp rack in the trunk.
Anderson connector being wired so the car can get power at CES
#115
Next were wrapping our sub and rear speaker pods
Next were wrapping our sub and rear speaker pods
Wiring up the amp rack and the caps
Kenwood Headunit is in with custom double din enclosure
Last piece to be fabricated. Rear Panel to cover the sub enclosure.
Picture with the neon. It really shows off the depth of the amp rack
Rear Panel covers getting glassed
System was finished at 8am in the morning. Photo Shoot was scheduled at RCH in Huntington Beach at 2pm. We still had to weld the exhaust tips, put the wheels back on, and get the car detailed
5th flat bed trip in the last month for the SL. Heading back from LA to my office
At RCH Designs for the PAS Cover Photo Shoot
New Exhaust Tips and BASF Liquid Metal Pinstripe were added to the Carbon Fiber Wheel Lips
More shots from photo shoot at RCH
More shots from photo shoot at RCH
More shots from photo shoot at RCH
Ryan from RCH doing some post process work
Next were wrapping our sub and rear speaker pods
Wiring up the amp rack and the caps
Kenwood Headunit is in with custom double din enclosure
Last piece to be fabricated. Rear Panel to cover the sub enclosure.
Picture with the neon. It really shows off the depth of the amp rack
Rear Panel covers getting glassed
System was finished at 8am in the morning. Photo Shoot was scheduled at RCH in Huntington Beach at 2pm. We still had to weld the exhaust tips, put the wheels back on, and get the car detailed
5th flat bed trip in the last month for the SL. Heading back from LA to my office
At RCH Designs for the PAS Cover Photo Shoot
New Exhaust Tips and BASF Liquid Metal Pinstripe were added to the Carbon Fiber Wheel Lips
More shots from photo shoot at RCH
More shots from photo shoot at RCH
More shots from photo shoot at RCH
Ryan from RCH doing some post process work
Thread
Thread Starter
Forum
Replies
Last Post
MishaDesigns
Cayenne | Panamera | Macan
1
03-07-2013 06:05 PM