Teamspeed.com

Teamspeed.com (https://teamspeed.com/forums/)
-   Porsches from the Past | General Porsche News (https://teamspeed.com/forums/porsches-past-general-porsche-news/)
-   -   My Second Porsche! (https://teamspeed.com/forums/porsches-past-general-porsche-news/82986-my-second-porsche.html)

MC321 09-12-2014 01:01 PM

Today I removed the rockers, camshafts, heads and rods. Time to clean and then package the important stuff and ship to a good machine shop for some work!

https://cimg4.ibsrv.net/gimg/www.tea...6e7b7cc067.jpg

https://cimg1.ibsrv.net/gimg/www.tea...12954e4b93.jpg

https://cimg8.ibsrv.net/gimg/www.tea...a931fb85b0.jpg

0-60Motorsports 09-12-2014 01:04 PM

By the looks of it those rod bearing shells needs to be replaced along with the crank shells. Make sure you get some and have them WPC treated along with all your other internals.

MC321 10-04-2014 04:11 AM

The build is currently on hold, heads are being rebuilt by G2Performance, rods by Rennsport and cams reground by John Dougherty. Hope to get all parts in in a month or so to start re-assembling.

Here is my custom harness built by a good friend. Top notch quality, will be plug and play for my new EFI setup and MSD. Heat shrunk and wrapped in fiberglass sheathing.


https://cimg1.ibsrv.net/gimg/www.tea...658235c1a9.jpg

m4rk3t 11-02-2014 10:34 AM

Always been a big fan of the whale tail. Beautiful vehicle.

MC321 11-03-2014 05:05 AM


Originally Posted by m4rk3t (Post 1465065)
Always been a big fan of the whale tail. Beautiful vehicle.

Whale tail is gone :) Lots done so far..

Case supersonically cleaned

https://cimg8.ibsrv.net/gimg/www.tea...4ee4e1cdd4.jpg

More parts are here
https://cimg9.ibsrv.net/gimg/www.tea...5637ed18f1.jpg

All new custom fuel lines installed
https://cimg2.ibsrv.net/gimg/www.tea...2a2b09d67a.jpg

Radio deleted and wideband/voltmeter gauges installed (not wired yet)

https://cimg3.ibsrv.net/gimg/www.tea...b852e87b46.jpg

Rebuilt heads received
https://cimg4.ibsrv.net/gimg/www.tea...575c92fca5.jpg

Other ongoing bits include

1) Old fuel tank is out, area is being cleaned and painted. New fuel tank on the way.
2) Replacing old main fusebox with ATO fusebox and revisiting the entire wiring of the car
3) Oil cooling system fully removed and will be replaced soon
4) All brakes coming off, calipers being rebuilt and new brakes installed.
5) Suspension will be refreshed and car lowered to Euro height
6) EFI system and ECU will be installed and wired
7) Engine bay cleaned and painted

and many other things.. looks like my time line will be extended.. will start assembling the engine in a week when my rebuilt rods arrive.

Dyna 11-03-2014 05:17 AM

good luck on the build! thanks for keeping us up to date! it will b a stunner i'm sure of it.

D

BRN9121 06-14-2015 01:43 AM

Update update update!!!!


All times are GMT -4. The time now is 10:46 PM.


© 2024 MH Sub I, LLC dba Internet Brands